The nail specification used is dependent on the thickness of the joists being used.
Doubled floor joist with another joist near.
Holes anywhere in the web.
Most new construction uses 2 by 8 lumber for joists although 2 by 6.
In a perfect world any floor joist that is cut should have a header installed preferably two and doubled adjacent joists.
If you are doubling up floor joists creating trimmers or trimming joists around stairs and chimneys they all need connecting properly so that they can act as a single unit.
Away from the top and bottom.
Putting a partition directly over a single joist increases the load on the joist by 71 to 95 it s even worse if the joists were sized for a 30 psf bedroom load.
Because of this the tail end of the new lumber is not supported.
Usually when a joist gets sistered the new lumber does not span the entire length of the old joist.
Of walls and rim joists.
It is important to jack this end level to keep the floor from sagging any more and to keep the joists from splintering later.
I was just following the instructions in a diy book.
If i was making beams instead of double joists i would ve put the screws closer to the edge like maybe 1 instead of 2.
Purchase the type of lumber that matches the width of the existing joist.
Through bolting would ve been better.
Drill holes with a diameter of no more than one third the depth of the joist staying 2 in.
In fact most have little perforated knockout holes that can be punched out with the swing of a hammer.
Where and how to drill joists for electrical cables or.
So instead of having a post run all the way from the roof to the ground it can stop at the double floor joist.
The purpose of the headers are to transfer the floor load to the adjacent trimmer joists.
Making double joists yup i think you re right.
Eurocode 5 offers good advice on how this should be done and covers the size of nail or bolt and their location and centres.
The main reason for doubling up floor joists is to double the strength of a single floor joist.
Notching wood and boring rules engineered i beam rules.
Holes anywhere in the web area of engineered i joists except within 6 in.
This allows you to install a supporting post off the double floor joist to hold a second storey or a roof beam.
You can drill 1 1 2 in.
Measure the width and length of the existing joist.
You can get away with this on short spans but you re likely to have problems if the span is near the maximum.