Floor ducts are located at the end of the duct work used to supply air to a room.
Duct to connect to floor duct.
When the main ducting is complete you can run the flex duct to each room s supply vent.
Seal the new flex duct to the new box with plastic ties keeping the connection between the duct and the box as tight as possible.
Or 4 x 12 in.
Add additional hangers as needed.
There are three types of boosters.
In retrofit applications many companies focus on sealing connections but they often don t truly address sagging ducts with proper strapping.
The third type shown here is a recessed fan that fits into the duct and is flush with the floor.
Find duct transitions connectors at lowe s today.
How to install floor ducts.
Connect remaining sections of the duct board with duct connectors or collars.
Attach the flex duct to the duct board with a duct connector and a zip tie.
How to bring heat to the floor in a basement.
Nail the other end.
3 don t use temporary tape also called duct tape to connect the flex duct inner liner to the metal takeoff elbow or register boot.
This keeps the duct up and away from the ground.
Jack rise spoke about how he tested a duct and measured a 2 wc change in static when he altered a duct from sagging to properly strapped.
To ensure proper connections minimize leaks and maximize efficiency it is important to understand how to properly connect the duct work.
The simplest is a fan unit that sits on top of the register.
The ducts typically come in rectangular shapes and are attached to the bottom of the.
Recessed duct fans are sized to fit either a 4 x 10 in.
These pieces are connected to distribute air throughout the house.
The duct work is made of pieces of sheet metal that are either round or rectangular.
4 use mastic at every joint metal to metal and metal to plastic.
The allowable amount of sag is only 1 2 per 4 of.
Homeowners expanding their existing first floor duct work to the second floor need more space than walls typically provide so they must cut a hole in the.
Use plastic ties placed every few feet to attach the entire length of the duct to the bottom of the floor joists.
Tape around the edges.
Running a duct from the first floor to the second involves creating a hole in the main duct and attaching new duct work that terminates in a floor level heat register on the second floor.